Skip to content
Climate Project Explorer

Tejona Wind Power

Geography
🇨🇷 Costa Rica
Approval FY
1992
Fund
Global Environment Facility
Co-Financing
$28,000,000

Summary

The project will consist of installing a sufficient number of wind turbines (between 40-100 units) to generate 20 MW at Tejona, near Lake Arenal. In addition to the wind turbines, the project would add a control center for the wind power plant and a connection to the power grid. Through this project, wind power will displace thermal power plants that would otherwise have been built and thereby reduce CO2 emissions by approximately 60,000 tons per year.

Documents

Each project in our database can contain one or more documents.

Document
Topics
English (Original Language)
Energy supply mitigationRenewable energyClimate financeClimate fund+ 26 more

About this project

Geography
🇨🇷 Costa Rica
Fund
Global Environment Facility
Co-Financing
$28,000,000
Status
Project Completed
Implementing Agency
Inter-American Development Bank
Type
Project
Topics
, ,  

 Topics mentioned most in this project

See how often Topics get mentioned in this project and view specific passages of text highlighted in each document.

Group
Topics
Policy instrument
Risk
Just transition
Climate justice
Renewable energy
Fossil fuel
Greenhouse gas
Economic sector
Adaptation/resilience
Finance

Note

Global Environment Facility

Project information is sourced from the Global Environment Facility. Please check terms of use for citation and licensing of third party data.